Changes to the way the planning system operates (including national planning policy) is likely to have a strong influence on the range and content of planning policies we include in our Local Plan 2020. Passive Provision:Establishing all of the associated cables, chambers and junctions to allow for charging points to be installed without the need for undertaking works that require breaking ground. Active Provision:An active OLEV compliant chargepoint, such that each dwelling has the opportunity to charge their vehicle at the same time with a total charging time not exceeding 8 hours. A proposed new policy inclusive design will set out expectations in relation to accessible and adaptable development, including residential development, that policy is proposed to eventually replace existing policy PSP37 Internal Space and Accessibility Standards for Affordable Dwellings. This means that where radioactive waste generation cannot be avoided or minimised at source, it will be disposed of in accordance with the relevant national policy and strategies. Applications for Development Consent Orders (DCOs) for NSIPs are made to the Planning Inspectorate (PINs), who examine and test the proposals against criteria on national need, benefits and impacts as set out in relevant policy. But South Gloucestershire is a great place to live, work and visit. How will we know what level of parking provision is suitable on a site within the zone? Updated technical guidance will be prepared by the Council to accompany the policy and explain how we expect applicants to demonstrate that their development proposals comply with the policy requirements. d) An appropriate level of space and facilities are provided and designed into the development for the sorting and storage of recyclable waste materials, the composting of household waste, and the collection of these and other waste materials; and. For residential development, two policy options are presented to achieve net zero carbon. Given the designations on the estuary the Habitats Regulations will also be relevant. Early discussions have also contributed to the development of a new planning policy relating to decommissioning. In terms informing of the LPAs role, other emerging Local Plan 2020 policies sets out an overarching framework for the decommissioning and restoration of the Oldbury site against which pre-application advice and planning consents will be considered, and will also help inform the Councils response to any consultations on consents, licenses or permits from other organisations. The response from staff, business and residents has been incredible and has epitomised what South Gloucestershire has done well for many years, pulling together our skills, expertise, and commitment to support and strengthen our local communities. But please see the Building a Strategy, Creating Sustainable Villages sections for potential approaches which may involve Severnside. Note: Regulations are continuously reviewed and the status of the site may change in future. It will include where. These should include plans for phasing, and triggers for the delivery of key supporting infrastructure in order to secure the timely implementation of mitigation. Where trees are provided within areas of public realm, suitable below ground provision must be made to ensure their longevity; b) Net gains for biodiversity, tree cover and landscape diversity have been achieved. The design of buildings should help to enable the creation of well-designed public realm, parking and landscape to emerge through the design process. The 95 will be index linked and therefore increase annually. These are the minimum requirements for energy efficiency and on-site renewable energy generation that must be met. Overall health in South Gloucestershire is good and improving, and life expectancy is higher than the national average. We also want to be clear which of our existing policies may need to evolve and eventually be replaced. Given the location of the existing power station on the edge of the Severn Estuary and surrounded by low-lying Levels, and the timeframes involved with decommissioning, resilience to flood and climate change will be important considerations for both decommissioning and planning relating to radioactive waste. All of these documents are used by. The site would fall within the requirements of the Radiation Emergency Preparedness & Public Information Regulations (REPPIR) 2019 and would require off site arrangements to be put in place in the event of a release of radiation. You can read more in the Action Plans 1 6 document. New Local Plan for South Gloucestershire consultation - deadline 1st Core Strategy Policy CS37 Nuclear Related Development (partial)Policies Sites and Places Plan policy PSP46: Oldbury New Nuclear Build (NNB). South Gloucestershire Council to drop regional growth plan Are located in areas identified as suitable for renewable energy development in the technical maps (to be included in the Appendices of the Local Plan); orb. Small modular reactors are understood to occupy approximately 10% of the footprint of a large scale NNB. This approach can have significant visual, community and conservation benefits. This Council Plan maintains our focus on being an efficient and innovative organisation, working closely with our communities and partners to shape and improve the outcomes and prospects for South Gloucestershire, our residents and businesses. Age UK South Gloucestershire is an independent local charity with its own locally elected board of trustees and is part of the Age UK network. We host key junctions for five motorways, both Severn crossings, have high speed rail lines to London and South Wales and have a large international port and airport nearby. Do you agree with our proposed policy approach? 3) MovementSafe, convenient, sustainable and direct movement between areas of the district is an integral part of well-designed places. Community benefits beyond the requirements of the Planning Acts may also be sought through the provisions of the Local Government Acts, other legislation, through voluntary agreement with the project provider, or in accordance with an industry protocol. The location, site planning, layout and design parameters for construction operations and all NNB related buildings, infrastructure, and mitigation measures avoids, minimises, mitigates or compensates for community, economic, and environmental impacts on the local and wider area, both in the short and longer term. The financial contribution required is set at 95 per tonne of carbon dioxide (or index linked equivalent from date of plan adoption) that would be emitted from the development over a period of 30 years. Strategic policies are those necessary to address the overarching priorities for the area, including policies that address cross-boundary issues. This masterplan should set the overall strategy for the site, and provide the context for more detailed development proposals. . Given the intergenerational timeframes involved with decommissioning, the long timeframes involved in radioactive decay, and any potential hazards associated with low and very low level radioactive materials proposed to be disposed of on site, it will be vital to ensure that mechanisms are put in place to ensure that records are available and signposted to future organisations, land owners, decision makers and regulators, and to inform land use planning into the future. 3) MovementDevelopment proposals must create or enable sustainable connections to destinations, places and communities, both within the site and beyond its boundaries. In order to avoid impacts on social, health and community services and facilities serving existing communties, early delivery may be needed. 14:27, 28 FEB 2023. For these applications, consistency with the Development Consent Order and relevant certified documentation is the primary consideration, but national and local policy may also be relevant. You can access the document and information produced to support the Phase 1 document below. We have provided examples of how we will put the priorities and commitments into action and we are backing each commitment with a bespoke action plan, setting out what we will do and how you will know we are delivering value for money services, which are making a difference for your community. The expectation, based on evidence, is that this policy option will be viable and achievable in the near future for similar costs to those tested for Option 1. The following tables provide the range of policies which we intend to include in our Local Plan 2020. There are many strands to the inequality challenge and we must work with partners in health and education, with voluntary and community groups and directly with local people to first identify those at greatest need and to then put in place timely and appropriate support, ensuring that mechanisms, guidance and pathways to further education, employment and career progression etc. Our aim is to promote vibrant, mixed-use town centres with active public spaces, commercial, education, leisure, and cultural facilities. We also recognise that there are smaller cohorts of Black, Asian, and Minority Ethnic children and children from the gypsy and traveller community facing an even larger gap in attainment. Acceptable development proposal(s) must demonstrate that; a) The scale and massing of the built form relates to the site and the local character surrounding the development, with minimal amenity impacts relating to overlooking, over-shadowing and over-bearing issues; b) Construction materials are locally distinctive, complementary when viewed as a collection, and appropriate for their use and function, with a focus on robustness and a positive visual appearance over time; c) The arrangement and design of windows (the fenestration) is visually attractive, balanced and functional. The Councils evidence shows that on certain sites and types of development much higher standards can be achieved on-site, and this will be encouraged. We have an ageing population but recognise that most people as they get older want to remain independent for as long as possible. By incorporating comprehensive mitigation and adaptation measures, it is possible for new development to contribute to meeting the targets referred to in the policy on climate change. The site is adjacent to the existing Magnox power station that is now being decommissioned (referred to in this plan as Oldbury A). Renewable and/or low carbon energy supplies include, but not exclusively, those from biomass and energy crops, combined heat and power, waste heat from industrial processes, energy from waste, ground, water and air source heating and cooling, hydro, solar thermal, solar photovoltaic generation and wind power. South Gloucestershire Council has decided to join Bath & North East Somerset and Bristol city councils in pressing on with their Local Plans after metro mayor Dan Norris told the Government in May . Mineral Extraction, Working and Restoration, 11. How to pay any council bill, fine or invoice . are clear and accessible. On-site measures should be prioritised over carbon offsetting payments.